Skip to main content
This knowledge base is a set of documents your team fills in once and then reuses. Nothing here describes a specific company. Every workbook ships blank, with grayed E.g. examples you delete as you replace them. Work through the eight stages below in order. Track your progress on the setup checklist.
You do not need to finish all eight stages before running anything. Stages 1 to 6 are the minimum before your first campaign. The rest can follow.
Read what this framework covers first if you want the scope. This is an operations framework: it fixes the decisions, names, and records that make work reviewable. It does not teach you to operate an ad platform, and several gaps you will notice are deliberate.

How the knowledge base is organized

Two rules make the whole thing hold together:
  1. Fill a workbook once, link to it everywhere else. A brief that pastes in the positioning statement creates a second copy that drifts. Link instead.
  2. Every finished thing gets saved to its library. A campaign brief nobody filed is a campaign nobody can learn from.

The setup path

Read the glossary first, then work through each stage.
1

Stage 1: Locations

Fill in the asset directory: which tool holds creative, video, copy, landing pages, and brand files, and the link to each. Every kind of asset can live in a different tool. Then agree where filled-in workbooks, finished briefs, and reports go.Then: every later stage saves its output to a location recorded here.
2

Stage 2: Naming conventions

Set the patterns every name uses, after reading the naming conventions overview.
  1. Campaign, ad set, ad group and variant, and ad naming conventions.
  2. File and customer profile naming conventions.
  3. The experiment ID pattern, after reading experiment ID concepts.
Then: every campaign uses these names from the first build, and every file saved in later stages follows the file convention. Product short forms and profile names join the value lists in stages 4 and 5. See name something.
3

Stage 3: Brand

Fill in the brand workbooks in order: positioning, messaging, brand voice and tone, visual identity, logo usage. Then fill in brand assets: the source of truth and the asset register, with files named by the file naming convention from stage 2.Read brand strategy concepts and visual identity concepts first if you want the reasoning.Then: every creative and copy brief links to these. Nothing downstream restates them. Start at set up your brand for the walkthrough.
4

Stage 4: Products

Fill in a product page for each thing you sell, with a short form that never changes.Then: campaign names draw their product values from these pages, and every report can group spend by what it was selling. A single-product company can fill in one page inside ten minutes and move on.
5

Stage 5: Customer profiles

Fill in a profile page for each customer you sell to: the customer profile brief for B2B, or B2C customer profiles. Name each profile with the customer profile convention from stage 2.Then: save each finished profile to the customer profile library. Briefs link to a profile by name instead of redescribing it. See define a customer profile.
6

Stage 6: Tracking

Set up how links and events are tagged:
  1. UTM standards, after reading UTM parameters. UTM values come from the same lists as your campaign names.
  2. Event naming conventions, then your event tracking plan.
Then: every link is tagged from the UTM standard, and every conversion is recorded under an agreed event name. See set up tracking.
7

Stage 7: Reporting

Fill in the marketing reporting data dictionary, then KPI definitions, reporting cadence, and dashboard standards. Pick a starter pack if one fits: ecommerce or sales-led.Read reporting framework concepts first for the reasoning.Then: set up the flat file that every report reads from. See report on results.
8

Stage 8: Content

Fill in article standards, then set up the content calendar.Then: every article is written and reviewed against the same standards. See write an article.

Once setup is done

Everything after this is ordinary work, and every task has a walkthrough under Find what you need. Start with the walkthrough rather than a workbook. It lists the workbooks the task needs, in order.
Type: setup
Domains: setup
Provides: setup-path
Uses: article-standards, asset-locations, brand-assets, brand-voice, concept:experiment-id, content-calendar, customer-profile, dashboard-standards, data-dictionary, flat-file, glossary, kpi-definitions, library:event, logo-usage, messaging, naming-convention, naming-convention:audience, naming-convention:file, positioning, product-catalog, reporting-cadence, setup-checklist, utm-rules, visual-identity
Triggers: “Help me set up Snow Doughnut for my team” · “Where do I start?” · “Set up the framework for a new client” · “What do I need before my first campaign?” · “Onboard a new brand into the system”Asks, in order:
  1. Is this a new team setting up from scratch, or joining one that’s already set up? Options: your answer. Skip when: setup-checklist state shows stages complete.
  2. Which stage do you want to start with? Stages 1 to 6 are the minimum before a first campaign. Options: setup-path. Skip when: Workspace already shows completed stages; start at first incomplete.
  3. Where should filled workbooks, briefs and reports live? Options: your answer. Skip when: asset directory already filled.
  4. Is your business ecommerce or sales-led? Options: reporting-starter-pack (Ecommerce, Sales-led). Skip when: Stage 7 not in scope or data dictionary already filled.
Output: Walks the 8 setup stages in order, routing to each stage’s workbook process; progress recorded against the setup checklist; locations recorded in the asset directory.

Get the complete Marketing OS

Subscribe to Snow Doughnut, our free weekly newsletter, and get the Notion workspace where you do the work: tasks, a marketing calendar, name generators, briefs, and more.

Have us run it for you

We implement this system, use it to help you grow and scale, then hand it all off to you when you’re ready.
Last modified on November 2, 2026